Safety operating procedures for
riveting machine:
1. When using the riveting machine, the operator should stand firmly with his legs apart.
2. When testing the pneumatic riveting machine, it should be tested on wooden piers, not on concrete floors and steel plates.
3. When checking the wind bladders, the wind shut-off door must be closed before proceeding. It is strictly forbidden to lift the rivet gun, place it horizontally towards people and peep inward.
4. The socket of the pneumatic riveting machine should be tied to the handle with iron wire, and should be placed in a place that is not easy to collide if it is not used for the time being.
5. The air riveting must be confirmed after the top handle is firmly secured. If the work piece is large and the top handle personnel cannot be seen, they should respond to each other.
6. Before the back riveting operation, you should wear protective glasses, fasten the cuffs, and fasten the collar buttons. Keep the head away from directly under the rivets.
7. The wind riveting can only be started after the head of the socket touches the rivet, and it is not easy to start to give too much wind.
8. The core burning temperature is low and riveting is not allowed. When the nails are needed to exit, they must be allowed by the nailer before they can be tapped lightly.
9. When using the hydraulic riveting machine, the electrical switches, tubing joints and other parts should be in good condition, move flexibly, and the boom should have a firm end magnetic head. When moving, pay attention to people and things.